$42,750
Stated bid total
Comparison report
These contractors are made up. The wording, the PDF, and the share link all use this same sample. Bids don’t match? Now you can see why.
Stated bid total
Stated bid total
Stated bid total
Same checklist for every bid, quoted in each bid's own words.
Permit fees and inspection coordination included: $900.
Contractor obtains permits and coordinates inspections; fees included.
Protect existing floors and set up dust barriers.
Dust walls, floor covering and daily work-area cleanup included.
Remove existing cabinets, counters and flooring. Haul off demolition debris.
Remove existing cabinets, counters and flooring. Haul off demolition debris.
Remove existing cabinets, counters and flooring. Haul off demolition debris.
Electrical rough-in and finish for kitchen outlets and lighting.
Electrical rough-in and finish for kitchen outlets and lighting.
Electrical rough-in and finish for kitchen outlets and lighting.
Plumbing rough-in and reconnect sink and dishwasher.
Plumbing rough-in and reconnect sink and dishwasher.
Plumbing rough-in and reconnect sink and dishwasher.
Patch drywall and match existing texture.
Patch drywall and match existing texture.
Patch drywall and match existing texture.
Supply and install painted shaker cabinets.
Supply and install painted shaker cabinets.
Supply and install painted shaker cabinets.
Supply and install quartz countertops.
Supply and install quartz countertops.
Supply and install quartz countertops.
Tile material allowance: $1,800. Installation included separately.
Backsplash tile as needed. Materials TBD.
Supply and install white 3 x 12 ceramic backsplash tile: $2,600.
Install engineered wood flooring in kitchen.
Install engineered wood flooring in kitchen.
Flooring allowance to be determined after selection.
Paint kitchen walls, ceiling and new trim.
Paint kitchen walls, ceiling and new trim.
Paint kitchen walls, ceiling and new trim.
Sink and faucet material allowance: $950 total.
Fixture allowance: $500.
Supply stainless undermount sink and chrome pull-down faucet.
Install three owner-selected pendant lights; fixtures supplied by owner.
Lighting by agreement.
Three pendant fixtures: $250 each material allowance; installation included.
Appliances supplied and installed by owner; appliance work excluded.
Appliance supply excluded.
Owner supplies appliances. Contractor installs and connects them.
Final construction clean included.
Final clean by owner.
Debris removal and final construction clean included.
On a free report of your own bids, this table shows statuses only. Source wording is part of the full report. This page shows the fictional wording so you can see the layout. “Not mentioned” is not an exclusion.
The details most likely to change your price or your project.
One document explicitly excludes appliances while another treats it as included or an allowance.
One document explicitly excludes final clean while another treats it as included or an allowance.
At least one bid does not mention permits & inspections, while another bid documents it. Silence is a question, not proof the work is excluded.
These are the words written in the bids. A deposit amount is not scored. No price was added except where a written percent can be applied to a printed total or a sum of priced lines.
On a comparison you upload, the free report shows statuses, a stated total or the sum of priced lines, three red flags, and the first three not-covered names. The full report adds source wording, the rest of those lists, questions, contract terms, a PDF, and a share link. This sample is not locked.